We should have known after seeing the boat, that it was going to be a strange trip.  First was a Marina that we couldn’t get into for loading.  We had to have the party boat sea-towed to Marine Max on the other side of the lake.  Then there was the delivery in Chicago.  The city routed us down roads shut down for construction, under railroad bridges that were a foot too low, and around corners that a bobtail couldn’t even make.  After the delays, “4 Play” made it to the destination unharmed.

Pin It on Pinterest